top of page
Search
  • Harry Gaffney

Limerick Township: West Cherry Lane

Updated: Aug 23, 2019

This 2016 project, this project had two separate work areas.  The major portion of the project involved re-configuring the intersection of Limerick Center Road and West Cherry Lane.  A substantial profile change was engineered which removed a 4’ vertical curve and involved utility revocations, storm drainage, curb, sidewalk, excavation and full-depth road reconstruction.  The upper portion of the project included installation of a large concrete precast concrete end-wall, rip-rap aprons, curb, sidewalk and a modular block retaining wall.

183 views0 comments
bottom of page