Limerick Township: West Cherry Lane
- Harry Gaffney
- May 22, 2019
- 1 min read
Updated: Aug 23, 2019
This 2016 project, this project had two separate work areas. The major portion of the project involved re-configuring the intersection of Limerick Center Road and West Cherry Lane. A substantial profile change was engineered which removed a 4’ vertical curve and involved utility revocations, storm drainage, curb, sidewalk, excavation and full-depth road reconstruction. The upper portion of the project included installation of a large concrete precast concrete end-wall, rip-rap aprons, curb, sidewalk and a modular block retaining wall.

Comments