top of page
Post Archive
Search


Borough of Lansdale: Microsurfacing
In 2026, Marino Corporation was the prime contractor for the Borough of Lansdale in PA, and was hired for asphalt milling, pot-hole filling, crack sealing, and full coverage Microsurfacing of a residential neighborhood. Off of E. Handcock Rd., we had done from Willow St. all the way up Cherry St. on to Cedar St., and all 4 other parallel roads, along with 2 cross roads within. As well as many parts of E. Handcock Rd. and across the way on both Pennbrook Ave. and Highland Ave.
Sep 141 min read


West Chester University: Intersection Improvements
In 2025, Marino Corporation was the prime contractor for the University of West Chester, PA, and was hired to remove the old blacktop and curbs at the intersection of W. Rosedale Ave. and S. New St., to install new streetlights, ADA-accessible pedestrian ramps, and a channelized turn lane; and to redo the paving, crosswalks with indicators, and curbs. This was over a 14 week span of work. Construction worked around and complied with the University as to not interfere with stu
Aug 25, 20251 min read


West Chester: Bollard System Street Closure Installation
In 2025, Marino Corporation was the prime contractor for the Borough of West Chester, PA, and was hired to install both fixed Bollards and unfixed Barriers, as well as, adjusting the pavement at different points along West Gay Street to allow for ADA compliant ramps. We also adjusted the pre-existing fences, curbs, brick, and garden beds, if needed. This was over an 8 week span of work. At 4 different locations, the Matador Bollards were installed and aligned after expanding
Aug 25, 20251 min read


Ambler Borough: Street Improvements
In 2024, Marino Corporation was the prime contractor for the PennDOT Borough of Ambler in PA, to create new ADA-accessible ramps, curbs, and sidewalks, as well as install a bike rack around both Pickering Field and Knight Park within the residential neighborhoods. This was over an 8 week span of work. Pickering Field Knight Park Construction happens around residents in the area, doing our best to be as clean and organized as possible while keeping streets and driveways access
Jul 30, 20241 min read


Valley Forge Park: Granite Block Restoration
In 2021, Marino Corporation was the prime contractor for the Upper Merion Township in PA, for rehabilitation of the granite block pavement at the National Memorial Arch within Valley Forge National Historical Park, as well as, other miscellaneous construction on the property. This was over a 10 week span of work. Along St. Rt. PA-3031, with the National Memorial Arch to the south, we removed, categorized, and took inventory of every block, assigning a number to it. We then cl
Sep 10, 20211 min read


Swarthmore College: Field House Lane Reconstruction
Restoration of Swarthmore College's Field House Lane.
Nov 26, 20191 min read


Bryn Mawr College: Retaining Wall Reconstruction
Removal and replacement of retaining wall at Bryn Mawr College. Completed May, 2017.
May 23, 20191 min read


Limerick Township: West Cherry Lane
This 2016 project, this project had two separate work areas. The major portion of the project involved re-configuring the intersection of Limerick Center Road and West Cherry Lane. A substantial profile change was engineered which removed a 4’ vertical curve and involved utility revocations, storm drainage, curb, sidewalk, excavation and full-depth road reconstruction. The upper portion of the project included installation of a large concrete precast concrete end-wall, rip
May 22, 20191 min read


Franklin Field: Athletic Track and Field Installation
In the Spring and Summer of 2015, Marino Corporation was the general contractor of the installation of a new athletic track and field installation at the University of Pennsylvania's Franklin Field, home of the Penn Relays.
May 22, 20191 min read
bottom of page
