top of page
Search

West Chester University: Intersection Improvements

Aug 25
1 min read

In 2025, Marino Corporation was the prime contractor for the University of West Chester, PA, and was hired to remove the old blacktop and curbs at the intersection of W. Rosedale Ave. and S. New St., to install new streetlights, ADA-accessible pedestrian ramps, and a channelized turn lane; and to redo the paving, crosswalks with indicators, and curbs.


This was over a 14 week span of work.



Construction worked around and complied with the University as to not interfere with student and staff commutes as much as possible.


Construction Photos


 
 
bottom of page